How it works
From your floor plan to 24/7 flow
Tell us about your operation. We'll propose how to optimize it. Start with the space, staffing and flow you need to change. Here is how the project takes shape.
Step 01
Start with your operation
Tell us where you need more space, less labor or longer operating hours. We review your building, loads and flow to check what fits.
- Storage and flow needs
- Your SKUs and pallet loads
- Building and floor checks
Step 02
Plan the space and flow
We lay out the racks, load paths and controls, then simulate how they work together. The design starts with the storage and flow you need.
- Rack layout and load paths
- Equipment and controls design
- Software design and simulation
Step 03
Prepare and test the system
Equipment and software are prepared for your site. Checks cover shuttles, lifters, conveyors, controls and racking before installation.
- Equipment checks and testing
- Software for your operation
- Quality checks
Step 04
Install and prove the flow
Our engineers install and commission the system on your site. Trial runs check the equipment and flow before handover.
- Installation by our engineers
- On-site trial runs
- System commissioning
Step 05
Put your team in control
Your team gets training built for your system. We hand over the project documents as part of acceptance.
- System acceptance and handover
- Your project documents
- Training built for your team
Step 06
Support after go-live
Once you are running, we provide after-sales service: remote support, spare parts support and training built for your team.
- Remote support
- Spare parts support
- Training for your team
Plan your warehouse
Double your storage. Run 24/7.
Get 2x the pallet positions in the same building. Cut warehouse staff by up to 85%. Tell us about your operation. We'll propose how to optimize it. An engineer replies personally.